Flag Ostrom Painting & Sandblasting, Inc.
1110 8th Avenue / P.O. Box 4120
Rock Island, Illinois 61204-4120
Phone (309) 788-1933 Fax (309) 788-1952
eagle
 Ostrom Painting & Sandblasting, Inc. has been proudly serving our armed forces since 1981.  

photos photos 2

Ostrom News


Industrial Division

Ostrom Painting & Sandblasting, Inc. recently awarded projects:

Smithville Lake Gate Repair and Painting, Smithville Lake, Missouri:
•  Project Engineer, Rob Walker, Superintendent, Clark Kroeger and crew.

Coralville Lake Reservoir, IA Bulkhead Painting:
•  Project Engineer, Rob Walker, Superintendent, Clark Kroeger and crew.

Ostrom Painting & Sandblasting, Inc. recently completed projects:

Rehabilitation and Painting of Sluice Gates, Keystone Lake, OK:
•  Project Engineer, Rob Walker, Superintendent, Clark Kroeger and crew
.
•  The $1,900,000 project in Oklahoma was completed with an outstanding performance rating from the Tulsa District of the United States Army Corps of Engineers.
•  Received a 295 out of 300 points in the Tulsa District "Eagle Eye" safety program.

Hollow Jet Valves Recoating, Yellowtail Dam, MT:
•  Project Engineer, Rob Walker, Superintendent, Clark Kroeger and crew.
•  Application of high performance coating to areas prone to cavitation. Click on the article below for more information.

HYDRO REVIEW - Ostrom Painting & Sandblasting, Inc. Article

Surge Tank Painting, Glendo Power Plant, WY:
•  Project Engineer, Rob Walker, Superintendent, Clark Kroeger and crew.
•  Application of high performance coating to the interior of a 200' tall Surge Tank.

Lock and Dam 4 and 6 Gate Painting:
•  Project Engineer, Rob Walker, Superintendent, Clark Kroeger and crew.
•  The five year, $7,000,000 project on the Mississippi River was completed with an outstanding performance rating from the St. Paul District of the United States Army Corps of Engineers, the highest mark available. Great job guys!!
•  The United States Army Corps of Engineers Contractor Superior Safety Performance Award for the St. Paul District was awarded at the projects conclusion. This award is given to a single contractor with an excellent safety record and puts the contractor in a pool to receive a divisional safety award.

Lock and Dam 11 and 12 Bulkhead Painting:
•  Superintendent, Clark Kroeger and crew.
•  This job was completed ahead of schedule with no lost time accidents.
•  An outstanding performance rating was received form the Rock Island District of the United States Army Corps of Engineers, the highest mark available. Excellent work guys!!

Coralville Reservoir, Abrasive Blast and Paint Outlet Works Gates
•  Project Engineer, Rob Walker; Superintendent, Clark Kroeger and crew.
•  This job was completed ahead of schedule with no lost time accidents.
•  An outstanding performance rating was received form the Rock Island District of the United States Army Corps of Engineers, the highest mark available. Excellent work guys!!


Commercial Division

Ostrom Painting & Sandblasting, Inc. recently awarded projects:

Contracts
•  Rubber Removal and Striping at Grissom ARB, IN
•  Airfield Marking at Macomb Airport, IL

Sub-Contracts

5 Year
•  Rubber Removal/Airfield Marking at Charleston AFB, SC
•  Protective Coating Maintenance at Goodfellow AFB, TX
•  Protective Coating Maintenance at Offutt AFB, NE

3 Year
•  Protective Coating Maintenance at Minot AFB, ND

Lump Sum
•  Airfield Marking/Rubber Removal Offutt AFB, NE
•  Airfield Marking Iowa County Airport, WI
•  Airfield Marking Fort Smith Regional Airport, AR
•  Runway Marking at Ellsworth AFB, SD
•  Street Marking at Ellsworth AFB, SD
•  Airfield Marking and Rubber Removal at McConnell AFB, KS
•  Industrial Floor Coating at Tinker AFB, OK

Ostrom Painting & Sandblasting, Inc.